IHC FUNDEX FPD5000

The IHC FUNDEX FPD5000 is the largest piling rig in the range of IHC FUNDEX Equipment and can easily operate in unique rake positions. The FPD5000 can also be deployed as a 275 ton crawler crane, by removing the leader. This option maximizes the deployability of the machine.

The advantages of the IHC FUNDEX FPD5000:

  • capable of working with a maximum load of 65 tonnes for the hammer and pile
  • the installation of raked piles till 3:1 is possible
  • it can be used as a 275 ton crawler crane
  • able to erect itself without help of a service crane
  • the pile can be hoisted in piling position by the rig itself
  • strong tubular type light weight leader
  • despite its size, easy to transport
  • works also near shore from a pontoon.

Download productsheet - UK